>>>>>>>>>>>>>> Western Signal Eastern Signal
Bell: WCH Mechanical Bell 2nd Gen WCH Mechanical Bell 2nd Gen
Cantilever: Harmon Cantilever Harmon Cantilever
Mast Base: WCH 5" Single Sided ^ WCH 5" Single Sided ^
Lights: 6 - 12"x20" Harmon w/ Electro-Tech's LEDs
2 - 12"x20" WCH w/ Electro-Tech's LEDs
6 - 12"x20" Harmon w/ Electro-Tech's LEDs
2 - 12"x20" WCH w/ Electro-Tech's LEDs
Junction Boxes: 2 Harmon, 1 WRRS 2 Harmon, 1 WRRS
Gate Lights: 4" RECO 4" RECO
Gate Mechanism: WCH Style 3.5 w/ Standard Mount WCH Style 3.5 w/ Standard Mount
Gate Striping: Vertical Striping Diagonal Striping

All pictures were taken on November 13, 2020, by Tommy McGowan.
This crossing is located on the UP Kenosha Sub.

1 2
Overview of 2 gated cantilevers facing east. Overview facing west.
3 4 5
6 7 8 9
10 11 12 13
14 15 16 17
The western signal.
18 19 20
21 22 23 24
25 26 27 28
29 30 31 32
The eastern signal.
33 34 35 36
The relay bungalow in the southeast quadrant. The grade is all concrete. Track view facing north at Crawford Ave. Track view facing south towards Denton Ave.

.