Pictures 1-25 were taken on October
5, 2016.
Pictures 26-28 were taken on November 14, 2017.
The video was taken on September 5, 2018.
Pictures 29-33 were taken on May 14, 2025, by Nicholas
Miles/Northwestern Ohio Rail Productions.
All pictures and video were taken by Tommy McGowan unless
specified otherwise.
This crossing is located on the CSX Greenwich Sub, with W&LE
having trackage rights on it as well.
1
2
Overview of 2
gated signals facing west.
Overview facing
east.
3
4
5
6
7
8
9
10
11
The eastern signal.
12
13
14
15
16
17
18
19
20
21
The western signal.
22
23
24
25
The relay bungalow
in the southeast quadrant.
The northern
track's grade is wood and asphalt and the southern track's
is rubber and asphalt.
In November 2017, we see the GS E
Bell was surprisingly replaced by a WCH Mechanical Bell.
JUNE 2025 UPDATE: Sir Fluent here. Since
Tommy was last out here, a minor change was made with the
crossing.
29
30
31
32
33
On 5-14-25, Nicholas Miles made a
return trip to this crossing and discovered that the gate
arms on both signals were replaced and both signals now have
NEG LED gate lights. Furthermore, the bell was replaced
again. This time with an NEG E-Bell.