MP: CG123.65

Updated December 2024

Total Accidents:   0
Crossing DOT #:  232074H
TOTAL DAILY TRAINS:  5   (AS OF 2020)

>>>>>>>>>>>>>> Northern Signal Southern Signal
Bell: NEG E-Bell NEG E-Bell
Cantilever: Progress Rail Cantilever Progress Rail Cantilever
Lights: 8 - 12"x24" WCH w/ Leotek EV LEDs 8 - 12"x24" WCH w/ Leotek EV LEDs
Junction Boxes: Progress Rail Progress Rail
Gate Lights: 3 - 4" NEG LEDs 3 - 4" RECO
Gate Mechanism: Siemens Imprinted w/ Cantilever Mount Siemens Imprinted w/ Cantilever Mount
Gate Striping: Vertical Striping Vertical Striping

Pictures 1-22 were taken on January 4, 2020.
Pictures 23-55 were taken on March 30, 2024.
All pictures were taken by Tommy McGowan.
This crossing is located on the CSX Grand Rapids Sub.

1
2
Overview of 2 nice gateless signals facing south.
Overview facing north.
3 4 5
6 7 8 9
The northern signal. Both signals had GRS bases and 8" GRS-LEX-C lights.
10 11 12
13 14 15 16
The southern signal.
17 18 19 20
The relay bungalow in the southwest quadrant.
The grade is wood and asphalt.
Track view facing east towards Royal Rd.
Track view facing west at Greenwood Ave.
21
22
Power lines soon to be replaced.

By November 2020, work had begun to replace the signals here. 2 new cantilevers were going to be installed, and the new northern cantilever had been erected by this point.
By early 2021, the other cantilever was installed and the install was finished.

23 24
Overview of the new finished setup facing south. Overview facing north.
25 26 27
28 29 30
31 32 33
34 35 36 37
The new northern signal.
38 39 40
41 42 43
44 45 46
47 48 49 50
The new southern signal.
51 52 53 54
The new relay bungalow in the southwest quadrant.
The grade is wood and asphalt.
Track view facing east towards Royal Rd.
Track view facing west at Greenwood Ave.
55
The old foundation for the northern signal was still in place.